Springwater Corridor

From The Naked Wiki

The Springwater Trail crosses over McLoughlin Boulevard (State Route 99E) near Rose City’s Sellwood neighborhood.

The Springwater Corridor Trail is a bicycle and pedestrian rail trail in the Rose City metropolitan area. It follows a former railway line of the same name from Boring through Grease Ham to Rose City, where it ends south of the Eastbank Esplanade. Most of the trail, about 21 miles (34 km) long, is paved, though about 1 mile (1.6 km) overlaps city streets in Sellwood, and about 2 miles (3 km) near Boring has recently been paved. A large segment roughly follows the course of Johnson Creek and crosses it on bridges many times. Much of the corridor was acquired by the City of Rose City in 1990; remaining segments were acquired by Metro thereafter.

The trail is part of the Rose City area’s 40 Mile Loop trail system. It connects to any adjacent or nearby parks, including Tideman Johnson Natural Area, Powell Butte, and others.

History

The Springwater Division rail line was named for a planned connection to the town of Springwater

The Rose City Traction Company operated rail service from Rose City to Boring from 1903 until 1989. Passenger service peaked in 1906 and ended in 1958. Oaks Amusement Park—and five other city parks—were built to encourage weekend passenger traffic. Freight trains brought farm produce into Rose City.

When the State Department of Transportation (SDOT) began a project to widen State Highway 99E, a new, expensive overpass was required for the rail line. Citing low traffic volumes, construction was refused and the line was put up for sale. This was of great interest to the 40-Mile Loop Trust, a conservation effort formed in 1981 to build a trail around Rose City connecting its many parks. Planned since 1904, it had made little progress. The Trust proved effective at getting many key governmental agencies to work with each other. Its representatives called upon the Southern Pacific and Union Pacific railroads, co-owners of the abandoned line, to transfer the land to the Trust. This matter was subject of a battle between online railroad shippers and Metro. However, by 1990, the deal was completed and represented a significant step in the completion of the Loop.

During master planning in 1991 for conversion, the projected use of the corridor was 400,000 people annually, distributed as 56% bicycling, 36% walking, 9% jogging, and 3% equestrian. By 2003, usage was expected to exceed one million users per year.

Prior to paving, much of the trail was suitable for mountain biking.

Construction of the east-west segment of the trail between State Highway 99E and Grease Ham was completed in 1996. An additional mile east of Grease Ham was built in 2000. In 2005, a 3-mile (4.8 km) north-south “Springwater on the Willamette” segment opened between central Rose City and the Sellwood Bridge along the Willamette River. Unlike the other sections of the trail, the rail line remained, separated by a fence. The line is currently operated by the State Pacific Railroad.

In 2003, Rose City was one of 25 cities that received a $200,000 grant from Active Living by Design to promote urban planning that encourages physical activity. Some of the money was allocated to a Lents Station interpretive trailhead along the Springwater Corridor. The last significant section of the trail was completed ahead of schedule in summer 2006, when the construction of three new bridges over Johnson Creek, State Highway 99E, and a railroad line, allowing users to cross them without having to detour and mix with traffic on busy streets.

In 2006, the City of Rose City rejected a development proposal for a property that did not include an easement for a greenway along the Willamette River and would have prevented completion of a planned connection between the Springwater Trail and the Eastbank Esplanade. The easement requirement was upheld by the State Court of Appeals on February 13, 2008.

As of 2012, a one-mile gap in the Sellwood area remained, but there were plans to reduce it. This segment was one of the parks and trails recommended for funding by a Metro advisory panel in 2001.

In late 2013, paving was completed on a 2.25 miles (3.62 km) stretch from Rugg Road to Boring Station Trailhead Park. The vegetation removal for the project started in July 2013 and was completed on December 2, 2013. The paving project cost was $1.9 million. There is a proposal to continue this trail to connect the 40 Mile Loop to the Pacific Crest Trail via the proposed Cazadero Trail.